Waste power plant
Worksite and erection design assignment on the Nantes waste power plant: site evolution sheet per sheet, constructability books, boiler erection books, steel structure phasing, civil work reservation book and subcontractor coordination.
Waste power plant
Erection design office reinforcement, site follow-up and project management for the renovation of the Maubeuge waste power plant (UIOM), with process technical assistance.
Waste power plant
Two-phase assignment on the waste power plant: complete erection assignment (phasing, constructability, boiler dimensional book, technical notes), then update of the general arrangement drawings with integration of the standardised equipment coding (KKS) into the 3D model.
RUN Eva incinerator
Two phases on the Runeva waste power plant: worksite and erection design (site and steel structure phasing, constructability, boiler dimensional book, erection books), then design update in the design office following project changes.