Waste power plant

Bureau d etudes industriel pour unite de valorisation energetique UVE biomasse paille, client Paprec

Two-phase assignment on the waste power plant: complete erection assignment (phasing, constructability, boiler dimensional book, technical notes), then update of the general arrangement drawings with integration of the standardised equipment coding (KKS) into the 3D model.